matablog
Sunday, 1 May 2011
April 06
laying the foil with 100mm sag measure midway between the joist.
running the foil from the boundary joist to the other side.
laying the floor board call strand board. First the board was too long and we assemble the boards onto the floor joist.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment