Sunday, 1 May 2011

April 06

laying the foil with 100mm sag measure midway between the joist.

 running the foil from the boundary joist to the other side.

laying the floor board call strand board. First the board was too long and we assemble the boards onto the floor joist.

No comments:

Post a Comment